Factory License for Medical Device Manufacturing

A medical device manufacturer in West Bengal needs to check whether its premises require factory approval and which authorisations cover the devices it plans to make. The factory assessment depends on the manufacturing process, the number of workers, and whether the process uses power. The device assessment depends on intended use, risk classification and the proposed manufacturing arrangement. Check both before signing a lease or ordering equipment because a suitable building can still require changes to support the chosen device range, and each approval covers a different part of the operation.

When Does a Medical Device Site Need Factory Approval?

The Occupational Safety, Health and Working Conditions Code, 2020 came into force on 21 November 2025 and replaced the Factories Act, 1948. West Bengal published draft rules under the Code in July 2026. During the transition, the Code preserves earlier rules and notifications where they remain consistent with it and no later instrument replaces them. For a site under state jurisdiction, confirm which provisions of the West Bengal Factories Rules, 1958 and which directions the Directorate of Factories applies. If the state portal still refers to the earlier Act, use the current Code and any applicable saved notification to check coverage with the Directorate.

Count Workers and Check How the Site Uses Power

The Code’s ordinary factory definition covers premises with at least 20 workers where manufacturing uses power and at least 40 where it runs without power. Count workers across groups and shifts on the same day. For example, if 12 workers operate a powered line in one shift and nine different workers operate it later that day, count 21 workers for that day. The definition looks at whether the site meets the threshold now or met it on any day in the preceding 12 months. Check how the statutory definition applies to each role, including workers a contractor supplies, before relying on a payroll total.

The Code preserves different thresholds under qualifying state law and allows the appropriate government to extend factory provisions to specified premises below the ordinary thresholds. Therefore, check any applicable process notification, particularly if the works involve plastics or rubber manufacturing. Check establishment registration and general workplace duties separately. Registration can apply to factories at 10 workers, while general safety duties can reach establishments with 10 employees.

Distinguish Site Activity From the Building’s Label

Assembly that makes a product and packaging that prepares it for sale can fall within the manufacturing definition. If the site performs testing, check whether staff carry it out as part of production or as a separate service. Ordinary storage or office work alone generally falls outside the factory definition, while the Code expressly includes preservation or storage in cold storage within manufacturing processes.

Where the state requires factory plan approval, obtain it before the construction, extension or use that requires prior permission. The Directorate’s separate registration and licensing service deals with permission to operate. Consequently, retain the approved drawings as well as the operating licence, and check which conditions apply to each.

How Factory Approval and Device Authorisation Differ?

Factory scrutiny concerns the premises, layout, machinery and protection of workers. In contrast, device authorisation considers what the applicant will manufacture, where it will do so and whether the process and quality system support the device. If you consult a medical device establishment licence consultant in West Bengal, give them the proposed site details and device range so they can help identify which requirements to confirm with each authority.

Identify the Device Route

Start with the medical device’s intended use and the current classifications that the Central Licensing Authority publishes. For domestic manufacture for sale or distribution, the State Licensing Authority handles Class B and Class A devices that fall outside the specific Class A licensing exemption. The Central Licensing Authority handles Class C and Class D manufacturing licences.

Class A devices that are neither sterile nor measuring qualify for the specific licensing exemption under the Medical Devices Rules, 2017. Manufacturers must register eligible devices online and provide manufacturer, site and device details. Moreover, the August 2026 amendment brings quality management system compliance into the manufacturer’s declaration on standards.

If another party will manufacture at its premises, identify the applicant, site and devices in the arrangement. A loan licence, where applicable, authorises the applicant to use specified manufacturing facilities for the covered devices. Check the host’s role and regulatory status separately, and establish which party holds the factory permission for the premises. The commercial contract should reflect who actually carries out and controls each operation. For example, a business may rent a unit and run its own manufacturing there, while another business may rely on a host to carry out production. Describe each role when checking which device authorisation applies.

What Documents Should the Manufacturer Prepare?

Use a common site description across applications, while keeping the supporting documents specific to each approval. Compare the address, occupier, rooms, machinery and activities before filing. West Bengal’s Labour Department revised the factory plan and licensing document requirements in February 2026, so use the requirements for the service you are requesting.

Prepare the Factory Documents by Purpose

  • Premises and occupancy: For plan approval, prepare authenticated copies of the purchase deed, lease deed or rent receipt. Use the trade licence or other accepted evidence to establish the factory’s name, address and occupier. For registration and licensing, prepare an authenticated copy of the trade licence as specified.
  • Layout and process: Prepare a site plan, floor plan and sectional elevation, along with a process flow chart and brief description. Make the drawings consistent with the machinery positions and areas the team will use. Keep an annotated copy that staff can use to answer questions during a site visit.
  • Machinery and workforce: For registration and licensing, prepare the machinery list with power ratings and have the occupier sign it. Prepare the occupier’s signed declaration covering commencement, the workforce and installed power, as applicable. Keep the underlying calculations and headcount details available so the team can explain the figures.
  • Applicant and authority: Prepare the applicable company constitution documents or partnership deed and the relevant director or partner list. Identify the occupier and check who must sign each document. Where the site involves a hazardous process, include the health and safety policy that the state checklist requires.

Prepare the Evidence for the Device Application

For a Class B, C or D manufacturing licence application, prepare the manufacturer’s constitution details, the site or plant master file, the device master file and the applicable evidence of conformity with essential safety and performance principles. The site file describes the facility and operations, while the device file explains the product, its intended use and supporting evidence. Check the Fourth Schedule for the details that apply to the specific device and application.

For licensed manufacturing, prepare the applicable Fifth Schedule quality management documentation. Keep production and quality records accessible for audit or inspection. However, for eligible Class A devices on the registration route, use that route’s device information and declarations. Match the legal manufacturer and manufacturing address to the actual arrangement in both cases. If the product is a diagnostic device for testing samples outside the body, confirm the applicable performance evaluation evidence and the version of the device master file the rules require.

Document Environmental and Other Premises Permissions

The factory checklist asks for Pollution Control Board consent evidence at the relevant stage. Where the Board requires consent, keep the establishment and operating documents with the corresponding factory applications. If the Board classifies the process as White category, retain the intimation and declaration. Confirm which evidence the Directorate accepts for that category and keep any required building or fire approval with the site records.

How to Plan the Application and Inspection?

Build the schedule around the approvals that must precede construction or operation. Device classification, document preparation and supplier checks can usually proceed while the premises team confirms what the site can accommodate.

Sequence the Site and Device Applications

  1. Before signing the lease: Check the proposed building use with the competent local authority and ask the Directorate of Factories whether it requires a plan approval or other factory filing. If the site’s occupancy or industrial hazard triggers a fire approval, confirm the process with West Bengal Fire and Emergency Services.
  2. Before construction or installation: Check the West Bengal Pollution Control Board’s current industry category and siting conditions for the actual process. Where consent applies, obtain Consent to Establish before commencing the establishment works. Secure any required factory plan approval before work that depends on it. Submit the relevant plans and retain their approved versions.
  3. Before inspection or audit: Check which review applies to the application. The factory procedure can involve document scrutiny and a site visit. On the device side, a registered Notified Body audits Class B manufacturing sites before grant, whereas Class C and Class D require the prescribed inspection before grant. For Class A devices that need a manufacturing licence, the registered Notified Body audits the site after grant.
  4. Before starting operations: Confirm the factory licence covers the activity and file any applicable commencement notice. Where environmental consent applies, obtain Consent to Operate before production, including trial production. For the device, confirm that the appropriate licence, registration or other permission covers the applicant, premises and planned activity before making batches under that route.

After each review, save any approval, conditions, approved plan and inspection or audit record the authority or Notified Body gives you. Record how you addressed any observations and check that the final documents reflect the layout and activities the business will use.

What to Check Before Expanding or Changing the Site?

Compare the proposed change with the approved layout, the factory licence particulars and the device documents. Review the approvals separately if you plan to relocate. A new line at the existing address can also change the machinery, power, headcount, room use or environmental conditions that the original approval covered.

Check Each Approval Before Implementing the Change

Ask the Directorate whether a layout revision or extension needs amended plan approval, and whether the licence requires amendment for a change in workforce or installed power. If the operation will move, identify the factory approvals for the new premises before transferring production. For relocation of a licensed domestic device site, the device regulator’s 2026 instructions call for a fresh manufacturing licence and a further quality system review. Check the status of any building, fire or pollution permission that the change affects.

On the device side, the Sixth Schedule distinguishes major and minor changes for licensed manufacture. A change to equipment, testing or the manufacturing process can count as major if it affects device quality. Under Rule 26, obtain approval for a major change before implementing it and notify the licensing authority of a minor change within 30 days afterwards. A new device may also need its own authorisation or inclusion in the existing licence. Keep the approved scope and current manufacturing records available for inspection. For manufacturing licence retention, track endorsements with the base licence, since the retention period runs from the base licence’s original issue date.

Conclusion

Prepare a short description of the premises, production steps, workforce, use of power and devices the business plans to make. Ask the Directorate of Factories and the relevant device authority to confirm which routes apply. Resolve any site or device restriction that could change the project before committing to the premises or production equipment.

Frequently Asked Questions

Can we apply for a factory licence on rented premises?

Yes, rented premises can support an application where the arrangement permits factory use. West Bengal accepts applicable occupancy evidence for plan approval, including an authenticated lease deed or rent receipt. Check that the address, occupied area and applicant details match the plans and that the landlord permits the proposed use.

Does a small assembly unit automatically fall outside factory licensing?

No. Check what the assembly does, whether it uses power and how many workers attend across shifts. Also check whether a process notification applies below the ordinary threshold. If the premises fall outside factory licensing, assess establishment registration and other workplace duties separately before treating the headcount as decisive.

Can two manufacturers work from the same building?

They can propose shared premises, subject to the approvals and actual division of the site. Identify who controls each area, which machinery and facilities the parties share and who maintains them. Then check whether the factory and device authorities accept that arrangement and what each applicant must document.

What should we check before outsourcing sterilisation?

Verify that the provider holds a valid licence for the sterilisation activity and that it covers the proposed site. Define responsibilities for records and batch release. Also plan for the sterilisation site’s licence number on the device label when the 2026 labelling amendment makes that disclosure mandatory.

Can we add a device at an existing licensed factory?

Yes, if the factory permissions cover the proposed operations and the appropriate device authorisation covers the additional product. Check the device’s classification, intended use and manufacturing process. If it changes the approved scope, establish whether the regulator requires inclusion on an existing licence, a registration or a separate application.

Can we move equipment within the same production room?

Check whether the move changes the approved layout or affects access, safety arrangements or the manufacturing process. If the current plans show a fixed machine position, ask the Directorate how it treats the proposed revision. Also assess whether the move changes the device process or quality controls.

Does White category status remove the need for pollution paperwork?

White category status generally replaces pollution consent with intimation and a declaration under West Bengal’s siting policy. Confirm the classification for the actual process before relying on it. If the factory filing asks for consent evidence, ask which substitute document the Directorate accepts for that category.

Can a trial batch precede the commercial device licence?

A trial batch may follow a separate test licence route where the Medical Devices Rules require it. Confirm the permitted purpose, such as testing or evaluation, and the conditions on the activity before making the batch. Check the premises and pollution permissions too, since trial production can trigger operating consent.

Do contractors count towards the factory threshold?

Count contractor personnel who meet the Code’s definition of worker and work at the premises. Review their duties and attendance alongside the records for directly employed workers. Since the test includes groups and shifts across a day, check the total for relevant days rather than relying on permanent payroll.

Does a change in device packaging require prior approval?

It can. For licensed devices, the Sixth Schedule treats a change in primary packaging material as major. Other packaging specification changes can fall within the minor category. First establish what changes and which part of the packaging it affects, then follow the applicable approval or notification procedure.